Pengo TruLink User Manual

Page 29

Advertising
background image

PENGO TruLink Manual 29

OPERATING PROCEDURES (4” DISPLAY)

END PILE / SAVING DATA TO USB DEVICE:

When the pile is completed, touch the Menu Bar
and then End Pile. This action will bring up the pile
length key pad. Enter the fi nal length of the pile

extension and select Enter. This will automatically store
all installation data and reset the screen for the next Pile.

1

When the job is complete. Place a USB device
(fl ash drive) into the USB port located on the back
of the Display. The USB port cover may need to

be removed to access the port.

To export the data of a selected job to a USB device, select
the Menu Bar and then Main Menu on the bottom left of
the screen. This will bring up the main menu screen.

2

Touch Job Management and select the job(s)
you wish export to the USB device. Touch Select,
ensure the bold text at the top of the screen next

to “Current Job” matches the highlighted job.

3

Touch Export. An “Export Job to USB” screen will appear. Select Export Selection or if you want all data select
Export All. Data will then export to the USB device. When fi nished select Exit.

4

4d

4c

4b

1a

1b

3c

4a

3b

3a

Advertising