Super Systems CAT-100 User Manual

Page 13

Advertising
background image

CAT-100 Operations Manual

Super Systems Inc.

Page 13 of 51

With the wire coil in place on the insertion rod, place the insertion rod through an access port or

other designated conduit. Begin hand-tightening the threaded port connector by turning the

connector clockwise. See Figure 12.

Figure 12 - Placing insertion rod in access port and tightening threaded port connector

Using a wrench, turn the port connector clockwise to finish tightening it (Figure 13). Take care

not to overtighten the connector.

Figure 13 - Tightening port connector with wrench

Push the insertion rod until the wire coil is present in the testing atmosphere. The wire must

now soak in the atmosphere; the amount of time to soak the wire is based on the temperature

in the testing atmosphere. Table 2 shows the appropriate soak times.

Temperature in Testing Atmosphere

Soak Time

1575°F and higher

30 minutes

1574°F and below

40 minutes

Table 2 - Soak times based on temperature in testing atmosphere

Advertising