Sanyo DHX4852 User Manual

Page 45

Advertising
background image

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

2-35

Design of W-2WAY ECO-i SYSTEM Unit Specifications

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

Fig. 2-21

Remove 2 screws

Tubing cover

Bottom

Front

Remove 11 panel

screws from front

panel

Use cutting pliers or similar

tool to cut cover out

Fig. 2-20

Indentation

(4 locations)

Slit hole

4. Installation Instructions

4-11. Routing the Tubing

The tubing can be routed out either from the front or from the bottom. (Fig. 2-21)
The connecting valve is contained inside the unit. Therefore, remove the front panel. (Fig. 2-21)

(1) If the tubing is routed out from the front, use cutting pliers or a similar tool to cut out the tubing outlet slit (part indicated by

) from the tubing cover. (Figs. 2-20 and 2-21)

(2) If the tubing is routed out from the bottom, remove the slit

part (

).

Use a drill bit approximately 13/64 ft dia. to create holes at

the 4 slit hole indentations (openings).

Punch out the slit part (

).

Be careful not to damage the base plate.

TD831138-02_W-2WAY.indb 35

2007/07/26 14:31:07

Advertising
This manual is related to the following products: