Procedure 38, External packet handler, Procedure 39 – Nortel Networks NN43001-318 User Manual

Page 101: Transmission test using an mph

Advertising
background image

Packet data transmission

101

acknowledgment that the receiving ISDN BRI terminal is ready, the
call-originating ISDN BRI terminal can begin transmitting packet
data.

2

Verify that the transmitted data has been received successfully
by checking the transmitted information for accuracy. Read the
information on the screen or print it on the local printer.

3

Release the connection.

—End—

Repeat this test on other ISDN BRI packet data terminals as needed.

Procedure 38

Perform a D-channel packet data transmission test using an external packet
handler

Step

Action

1

From an ISDN BRI D-channel packet data terminal, dial another
ISDN BRI packet data terminal and establish an active call
connection.

After the call-originating ISDN BRI terminal receives an
acknowledgment that the receiving ISDN BRI terminal is ready,
the call-originating ISDN BRI terminal can begin transmitting
packet data.

2

Verify that the transmitted data has been received successfully
by checking the transmitted information for accuracy. Read the
information on the screen or print it on the local printer.

3

Release the connection.

—End—

Procedure 39

Perform a D-channel Switched Virtual Circuit packet data transmission test
using an MPH

Step

Action

1

From an ISDN BRI D-channel packet data terminal, dial another local
ISDN BRI packet data terminal or a remote packet data terminal
(depending on how you have configured your MPH application).
Establish an active call connection.

Nortel Communication Server 1000

ISDN Basic Rate Interface Installation and Commissioning

NN43001-318

01.02

Standard

Release 5.0

20 June 2007

Copyright © 2003-2007, Nortel Networks

.

Advertising