<4. Installation>

4-3

IM 01C27B01-01EN

4.3 Changing the Process

Connection

The transmitter is shipped with the process

connection specified at the time of ordering. To

change the process connection, the drain (vent)

plug must be repositioned.
To reposition a drain (vent) plug, refer to Figure 4.4

and use a wrench slowly and gently to unscrew

it. Then, remove and remount it on the opposite

side. Wrap sealing tape around the drain (vent)

plug threads (*1 in the figure below), and apply a

lubricant to the threads of the drain (vent) screw(s)

(*2 below). To tighten the drain (vent) plugs, apply

a torque of 34 to 39 N·m (3.5 to 4 kgf·m). Process

connector bolts are to be tightened uniformly to a

torque shown in table 4.1.

Table 4.1

Torque

Model

EJX110B

EJX310B

EJX430B

Torque(N·m)

{kgf·m}

39 to 49 {4 to 5}

F0404.ai

Drain/vent plug

Vertical impulse piping type

Horizontal impulse piping type

Note: For a horizontal impulse

piping type, moving the

process connectors from

the front side to the back

cannot be made.

Bolt

Process connector

gasket

1
2

Figure 4.4

Changing Process Connection

4.4 Swapping the High/Low-

pressure Side Connection

IMPORTANT

This section is applicable only for EJX110B

differential transmitters, and not applicable for

gauge or absolute pressure transmitters.

4.4.1 Rotating Pressure-detector Section

180°

This procedure can be applied only to a transmitter

with a vertical impulse piping type.
The procedure below can be used to turn the

pressure detector assembly 180°. Perform

this operation in a maintenance shop with the

necessary tools laid out and ready for use, and then

install the transmitter in the field after making the

change.

1) Use an Allen wrench (JIS B4648, nominal 2.5

mm) to remove the five setscrews at the joint

between the pressure-detector section and

transmitter section.

2) Leaving the transmitter section in position,

rotate the pressure-detector section 180°.

3) Tighten the five setscrews to fix the pressure-

detector section and transmitter section

together (at a torque of 1.5 N·m).

Reposition the process connector and drain

(vent) plugs to the opposite side as described in

subsection 4.3.

IMPORTANT

Do not rotate the transmitter section more than

above limit.

F0405.ai

Process connector

Setscrew

Before

After rotating 180°

Figure 4.5

Before and After Modification