B3.5 outline of component functions, B3.6 reset switch, B3.7 shutdown switch – Yokogawa YFGW410 User Manual

Page 28: B3.5, B3.6, B3.7, B3-3, Important

Advertising
background image

<B3. Structure and Parts of YFGW410>

B3-3

IM 01W02D01-01EN

B3.5 Outline of Component Functions

Table B3-1 Outline of the YFGW410 component functions

Name

Function

Reference

RS-485 connector

Connects to the host system that uses Modbus/RTU communi-

cation.

C4.4

RS-485 configuration

switches

Configures connection type to the host system (4-wire / 2-wire)

C4.4

Status indicator LED

A combination of three RDY, SYN, and ACTIVE LEDs indicates

the YFGW410 operation status.

F2.2

Reset switch

Resets the YFGW410.

B3.6

Shutdown switch

Shuts down the YFGW410.

B3.7

Maintenance interface

Connects the Field Wireless Management Console for setup and

maintenance of a field wireless network.

The PC, that has the FieldMate for setup and management of

field wireless devices via wireless network, can also be con-

nected (if used for the system without CENTUM VP).

C4.4

Serial port

Used for YFGW410 maintenance only. (Do not use this port dur-

ing normal network configuration and operation.)

C4.1

Field network interface 1 to 3 Connects to the host system that uses the Modbus/TCP, ISA100.

11a or other protocol communication.

C4.4

Power supply connector

Supplies electric power to the YFGW410.

C4.2

Synchronization connector

Connects two YFGW410 devices to each other for synchronous

communication in the redundancy configuration. Plug the termi-

nating connector into it if the system is not redundant.

C4.4

Field wireless backbone

interface 1 to 4

Connects YFGW510, YFGW610, and the wireless LAN access

point to configure the field wireless backbone.

C4.4

DIN rail mounting bracket

Secures the YFGW410 onto DIN rails using brackets.

C3.3

B3.6 Reset Switch

Resets YFGW410. Hold the Reset switch for more than six seconds, the database in the

YFGW410 is initialized. If the database is initialized, the entire setup information of the device is

cleared. Always make a backup copy of the database before starting its initialization.

IMPORTANT

When initializing the database, don’t power off until RDY LED becomes green. Otherwise initiali-

zation will be failed and YFGW410 may not work correctly.

B3.7 Shutdown Switch

Shuts down YFGW410. Hold the Shutdown switch more than six seconds. Once shut down the

YFGW410, start it again by turning the power supply OFF first, and then turn it ON again.

Advertising