Verify and Change Transmitter

Parameter Setting and Values

The parameters related to the following items are

minimum required to be set for operation, and set at

factory as specified in order. Confirm or change the

parameters if needed.

• Measurement range (measurement lower/

upper limit, unit)

7.2 Zero Point Adjustment

After completing preparations for operating the

transmitter, adjust the zero point. There are two

zero point adjusting ways.

IMPORTANT

Do not turn off the power to the transmitter

immediately after performing a zero point

adjustment. Powering off within 30 seconds of

performing this procedure will return the zero

point to its previous setting.

(1) When you can obtain the Low Range Value

from the actual measured value of 0%

(0kPa, atmospheric pressure);

Using the transmitter’s zero-adjustment

screw

Before adjusting zero point, make sure followings.

• That the External zero trim parameter

(External Zero Trim) is “Trim on”. For details,

refer to section 8 “Setting Parameters”.

• Use a slotted screwdriver to turn the zero-

adjustment screw. Turn the screw clockwise

to increase the output or counterclockwise to

decrease the output.

The zero point adjustment can be made with

a resolution of 0.01% of the setting range. The

degree of zero adjustments varies with the screw

turning speed turn the screw slowly to make a fine

adjustment, quickly to make a rough adjustment.

Using the Device Configuration Tool

Refer to subsection 8.3.10 “Zero Point Adjustment

and Span Adjustment”.

(2) When you cannot obtain the Low Range

Value from the actual measured value of

0%;

Adjust the transmitter output value matches to

the actual measured value obtained by precise

pressure measurement equipment.
[Example]
The measuring range of 50 to 250 kPa : the actual

measured value of 130kPa.

130–50

250–50

Actual measured value=

x100=40.0%

Using the transmitter’s zero-adjustment

screw

Turn the zero adjustment screw to match the output

signal to the actual measured value.

Using the Device Configuration Tool

Refer to subsection 8.3.10 “Zero Point Adjustment

and Span Adjustment”.

7.3 Starting Operation

After the zero point adjustment is completed, the

transmitter is already the operating status. Follow

the procedure below.
1) Confirm the operating status.

2) After confirming the operating status, perform

the following.

IMPORTANT

• Close the terminal box cover and the

amplifier cover. Screw each cover in tightly

until it will not turn further.

• Tighten the zero-adjustment cover mounting

screw to secure the cover.