13 plc controller – Sterlco SDAP 90-225 CFM Series Drying and Conveying Systems User Manual

Page 37

Advertising
background image

SDAP Series PD 2 to PD 4 Drying and Conveying Systems

Page 37

Figure 13

Dump Delay Settings

Conveying
dump delay
timing inputs

Terminals
for jumpers

See Timing Configuration Chart

below for timing configurations

Jumpers

18 GA

Yellow

4

1/16

1/17

1/18

1/19

31

32

33

31

32

33

4

Yellow

terminals

for jumper

PLC

Timing Configuration Chart

1/16 1/17 1/18 Dump

delay

preset

0 0 0

5

seconds

0 0 1

10

seconds

0 1 0

15

seconds

0 1 1

20

seconds

1 0 0

25

seconds

1 0 1

30

seconds

1 1 0

35

seconds

1 1 1

40

seconds

Note: Jumpers are provided for setting the dump delay time. Use this chart to remove or add

jumpers and set the dump delay time you want.


4-13 PLC Controller

The PLC controller uses an Allen-Bradley programmable logic controller (PLC). This “brick”-
type controller has 32 I/O points: twenty (20) inputs and twelve (12) outputs, all inputs and
outputs are 115 VAC.

All programming and logic is factory-installed on an EEPROM chip and cannot be modified. A
battery backup retains programming if power fails. Battery life is five (5) years at room
temperature.

If the alarm indicator blinks intermittently, replace the battery within one week.

Advertising