9. After the proper pre-drying time for the initial hopper fill has elapsed, fully open the

drying hopper slide gate.

10. Turn the machine loader

ON/OFF

switch to

ON,

and set the convey timer for the proper

conveying time. A ten- (10-) second convey time is recommend to start.

11. Adjust the inner tube on the take-off compartment if material does not flow easily to the

sight glass loader on the molding press.

12. If you are running out of material at the sight glass before the machine loader starts the

convey cycle again, lower the dump delay time by adjusting the yellow jumpers inside
the control panel.

Note: To allow proper residence time during continuous processing, maintain the material level

in the hopper at the midpoint of the air trap assembly.


5-3 Shutdown

1. Turn off the conveying system supplying the drying hopper.

2. When processing is complete, close the hopper slide gate and shut down any in-line

companion equipment, such as the aftercooler.

3. Turn the dryer

ON/OFF

selector switch to the

SEQUENCE SHUTDOWN

position. The

sequence shutdown operation turns off process heaters and keeps the process blower on
for twenty minutes to cool down the process. The regeneration cycle of the off-line bed
completes the cycle before the dryer shuts down completely.

4. To override the sequence shutdown turn the system

ON/OFF

switch to

OFF

.

5. To completely shut off the unit after sequence shutdown has completed, turn the system

ON/OFF

switch to

OFF

.

6. If needed, empty the drying hopper.

7. For maintenance or a long term shutdown, open (de-energize) the electrical disconnects

at the dryer and at the power drop.