Sterlco SDAP 90-225 CFM Series Drying and Conveying Systems User Manual

Page 39

Advertising
background image

SDAP Series PD 2 to PD 4 Drying and Conveying Systems

Page 39

Machine Loader Loading Complete (

I/12)

An input coming from a conveying timer that indicates when the conveying time is complete.

Drying Hopper Convey Power On (

I/13)

Optional

When

ON,

enables the Drying Hopper conveying process.


Drying Hopper Convey Demand Reed Switch (

I/14)

Optional

When

ON,

indicates a demand in the Hopper Loader; this activates the conveying cycle.


Convey To Process Loading Complete (

I/15)

Optional

An input coming from a conveying timer that indicates when the conveying time is complete.

Dump Relay Jumper Setup (

I/16, I/17, I/18)

These inputs determine the dump delay time period—a period that follows conveying period.

Output LED Indicators

Blower On (O/0)

The

Blower On

indicator lights when the blower energizes.


Process Heater Enable (O/2)

The

Process Heater Enable

activates the process heater. The indicator lights when the process

heater is energized. This condition occurs when no blower failures or high temperature
conditions exist.

Right Bed Regeneration Output (O/5)

The right

Bed Regeneration Output

activates the right bed regeneration indicator lights when

the right bed regenerates. When this indicator is off, the left bed is energized.

Left/Right Regen Heater Output (O/3, O/4)

The

Regen Heater Output

indicator lights when the indicated bed regeneration heater

energizes.

High Regen Temp Alarm (O/6)

When

ON,

indicates a high regen temp condition in either the left or right bed.

Advertising