HP XP P9500 Storage User Manual

Page 152

Advertising
background image

Table 38 Prerequisite Hardware (3DC Cascade (Cnt Ac-S Z x Cnt Ac-J Z) Configuration)

(continued)

Remarks

Description

Item

function is planned, connect a
bidirectional path beforehand.

Between the intermediate site and remote
site: Bidirectional physical path
connected by a FCP cable (mandatory).

Table 39 Storage System Setting Items (3DC Cascade (Cnt Ac-S Z x Cnt Ac-J Z) Configuration)

Remarks

Setting

Description

Item

If you use the Cnt Ac-J Z
Suspend function, set the timer
type to SYSTEM.

Use Remote Web Console for
the setup.

A journal group is required for
both the intermediate site and
the remote site.

Timer type: LOCAL.

Journal group

One or more journal volumes
are required for both the

Journal volume

intermediate site and the
remote site.

Use Business Continuity
Manager for the setup.

Command devices that can be
used for the following route lists

Command device

are required (see

Table 41

(page 153)

:

Route list required when all
sites are available

Route list used when a
failure occurs at a site
(recommended)

Use Remote Web Console or
Business Continuity Manager
for the setup.

Logical path

An inter-control unit logical
path is required between
the primary site and the
intermediate site (for both
directions).

An inter-disk controller
logical path is required
between the intermediate
site and the remote site (for
both directions).

Preparing the Configuration Files (3DC Cascade (Cnt Ac-S Z x Cnt Ac-J Z)
Configuration)

Table 40 (page 153)

lists the configuration files required for using Business Continuity Manager in

a 3DC Cascade (Cnt Ac-S Z x Cnt Ac-J Z) configuration.

152

Configuration definitions