Steps at the primary site – HP XP P9500 Storage User Manual

Page 169

Advertising
background image

Steps at the primary site

1.

From the primary host, define a path set consisting of inter-disk controller logical paths (Primary

→ Intermediate, Primary → Remote, and Intermediate → Remote) (or use Remote Web Console
to set up paths).

A path set definition file is created.

2.

From the primary host, create a route list (Primary

→ Intermediate → Remote) in the forward

direction.

3.

From the primary host, establish inter-disk controller logical paths (Primary

→ Intermediate,

and Primary

→ Remote).

Defining a 3DC Cascade (Cnt Ac-J Z x Cnt Ac-J Z) configuration

169

Advertising