Failover, Primary site host failure, When – HP XP P9500 Storage User Manual

Page 400: Operations can, Be performed, On both, Continuous, Access journal

Advertising
background image

Primary site host failure (when operations can be performed on both Continuous
Access Journal Z copy pairs)

Perform the procedures below when the host at the primary site fails and operations can be
performed on both Continuous Access Journal Z copy pairs.

The procedures below applies when you perform a failover to remote site 1. To perform a failover
to remote site 2, replace remote site 1 with remote site 2 and replace remote site 2 with remote
site 1 in the procedures.

Failover

1.

From remote site 1, execute the YKDELETE command for the Continuous Access Journal Z
copy pair between the primary site and remote site 2.

YKQUERY

YKDELETE

YKEWAIT GOTO(SIMPLEX)

2.

From remote site 1, execute the YKSUSPND REVERSE command for the Continuous Access
Journal Z copy pair between the primary site and remote site 1.

YKQUERY

YKSUSPND REVERSE

YKEWAIT GOTO(SUSPEND)

400 Maintenance and troubleshooting operations

Advertising