Steps at the remote site – HP XP P9500 Storage User Manual
Page 172
Advertising
4.
From the intermediate host, register a command device for the storage systems at the
intermediate site, primary site, and remote site.
Steps at the remote site
1.
From the remote host, define a path set consisting of inter-disk controller logical paths (Remote
→ Primary, and Remote → Intermediate) (or use Remote Web Console to set up paths).
2.
From the remote host, create a route list (Remote
→ Intermediate → Primary route).
172
Configuration definitions
Advertising