Steps at the remote site – HP XP P9500 Storage User Manual

Page 172

Advertising
background image

4.

From the intermediate host, register a command device for the storage systems at the
intermediate site, primary site, and remote site.

Steps at the remote site

1.

From the remote host, define a path set consisting of inter-disk controller logical paths (Remote

→ Primary, and Remote → Intermediate) (or use Remote Web Console to set up paths).

2.

From the remote host, create a route list (Remote

→ Intermediate → Primary route).

172

Configuration definitions

Advertising