Goulds Pumps CV 3196 i-FRAME - IOM User Manual

Page 101

Advertising
background image

134

11. Prepare the shaft for assembly as follows (see the illustration):

a) Fasten the clamp-ring bolts (236A) crosswise.

See the specified torque values.
Make sure that the shaft rotates freely.

b) Install a new O-ring (496).
c) Install the outboard labyrinth oil-seal (332A) into the bearing housing (134).

Place the drain slots of the oil seal at the bottom position (6 o’clock).
Make sure that the edges of the keyway are free from burrs. To protect the O-ring, cover the
keyway lengthwise with a piece of electrical tape before you install the oil seal.

236A

253B

134

496

332A

12. Install the shaft assembly into the bearing frame as follows (see the illustration):

a) Coat the outside of the bearing housing (134) with oil.
b) Coat all the internal surfaces of the bearing frame (228) with oil.
c) Install the shaft assembly into the bearing frame (228).

Make sure that the shaft rotates freely.

d) Install the clamp bolts (370C) in the bearing housing (134) and tighten by hand.
e) Install the jack bolts (370D) with the locknuts (423) in the bearing housing (134) and tighten by

hand.

228A

134

370D

423

370C

Maintenance

Model CV 3196 i-FRAME Installation, Operation, and Maintenance Manual

99

Advertising