Goulds Pumps CV 3196 i-FRAME - IOM User Manual

Page 61

Advertising
background image

1. Run the unit under actual operating conditions for enough time to bring the pump, driver, and

associated system to operating temperature.

2. Shut down the pump and the driver.
3. Remove the coupling guard.

See Remove the coupling guard in the Maintenance chapter.

4. Check the alignment while the unit is still hot.

See Pump-to-driver alignment in the Installation chapter.

5. Reinstall the coupling guard.
6. Restart the pump and driver.

Commissioning, Startup, Operation, and Shutdown

Model CV 3196 i-FRAME Installation, Operation, and Maintenance Manual

59

Advertising