Goulds Pumps CV 3196 i-FRAME - IOM User Manual

Page 104

Advertising
background image

122

168A

9. Install the remaining parts onto the bearing shaft as follows (see the illustration):

a) Install a new O-ring (496).
b) Install the outboard labyrinth oil-seal (332A) into the end cover (109A).

Place the drain slots of the oil seal at the bottom position (6 o’clock).
Make sure that the edges of the keyway are free from burrs. To protect the O-ring, cover the
keyway lengthwise with a piece of electrical tape before you install the oil seal.

332A

109A

496

10. Install the shaft assembly into the bearing frame as follows (see the illustration):

a) Coat the outside of the bearing housing (134) with oil.
b) Coat all the internal surfaces of the bearing frame (228) with oil.
c) Install the shaft assembly into the bearing frame (228).

Make sure that the shaft rotates freely.

d) Install the clamp bolts (370C) in the bearing housing (134) and tighten by hand.
e) Install the jack bolts (370D) with the locknuts (423) in the bearing housing (134) and tighten by

hand.

f) Attach the bearing-frame foot (241) and fasten the bolts (370F) by hand.

228A

134

370D

423

370C

Maintenance

102

Model CV 3196 i-FRAME Installation, Operation, and Maintenance Manual

Advertising