Post-assembly checks – Goulds Pumps CV 3196 i-FRAME - IOM User Manual
Page 121
Tools required:
• 5/32 inch hex wrench
1. Attach the condition monitor (761B) to the bearing frame (228A) using the hex-head screw (372T)
provided.
372T
228A
761B
2. Tighten the hex-head screw with a 5/32 inch hex wrench to 6 ft-lbs (8 Nm).
Post-assembly checks
Perform these checks after you assemble the pump, then continue with pump startup:
• Rotate the shaft by hand in order to make sure that it rotates easily and smoothly and that there is no
rubbing.
• Open the isolation valves and check the pump for leaks.
Install the back pull-out assembly (except HT 3196)
CAUTION:
Never remove the back pull-out assembly without assistance.
1. Clean the casing fit and install the casing gasket (351) on the seal chamber and stuffing-box cover.
2. Loosen the clamping bolts (370C) and jack bolts (370D) on the bearing housing.
Maintenance
Model CV 3196 i-FRAME Installation, Operation, and Maintenance Manual
119