Assemble the frame – Goulds Pumps CV 3196 i-FRAME - IOM User Manual
Page 108
228A
134
370D
423
370C
Assemble the frame
1. Support the frame assembly in a horizontal position.
2. Check the shaft-end play by moving the shaft forward and backward by hand, and note any indicator
movement.
If the total indicator reading is greater than the values in this table, then disassemble the shaft and
determine the cause.
Use this table as a reference for shaft-end play values.
Table 15: Shaft-end play
Frame
Double row bearing
Duplex bearing
STi inches (millimeters)
0.0011 (0.028)
0.0019 (0.048)
0.0007 (0.018)
0.0010 (0.025)
MTi inches (millimeters)
0.0013 (0.033)
0.0021 (0.053)
0.0009 (0.023)
0.0012 (0.030)
LTi inches (millimeters)
Not applicable
0.0010 (0.025)
0.0015 (0.038)
XLT-i inches (millimeters)
0.0014 (0.036)
0.0023 (0.058)
0.0010 (0.025)
0.0015 (0.038)
SCALE
0.160
3. Check the shaft-sleeve (126) runout.
Maintenance
106
Model CV 3196 i-FRAME Installation, Operation, and Maintenance Manual