JLG X14J Operator Manual User Manual

Page 114

Advertising
background image

X14JR0420113

110

BOOM LIFT MODELS X14J

JLG

7.10 GENERAL PERIODICAL CHECKS

After the first 2000 hours of operation, have a general check run on the machine, at a certi‑
fied JLG service centre, where the general condition of the machine will be assessed and
the form in Appendix 1 of this manual will be filled in.
Subsequent checks should be performed every 1000 hours of operation.
To find the nearest certified JLG service centre, contact your reseller.

Advertising