JLG X14J Operator Manual User Manual

Page 125

Advertising
background image

b) Go to the control position and switch the machine on.
c) Close one of the two right stabilisers completely and maintain the movement activated.

Read the pressure value. This value relates to the right track distributor.
Switch the machine off.

d) Connect the pressure gauge to fitting MA (ref. Hydraulic system).
e) Go to the control position and switch the machine on.
f) Close one of the two left stabilisers completely and maintain the movement activated.

Read the pressure value. This value relates to the left track distributor.

g)

Stabilise the machine.

h) Set the second arm cylinder to the FOLDING mode.

Keep the joystick in position. Read the pressure value.
This value relates to the aerial part distributor.

7.18 C

HECKING TIGHTNESS OF THE FASTENING SCREWS ON THE PIN RETAINERS AND THE LOCK NUTS

Check that the fastening screws on the pin retainers and lock nuts are not loose.

If they have become loose, tighten the bolts or the lock nuts, as specified in the para‑
graph “Pin locking bolts and nuts”.

X14JR0420113

BOOM LIFT MODELS X14J

JLG

121

Advertising