19 han, Hc modular 350 assembly instructions – Northern Connectors Harting HAN Industrial Rectangular Connectors User Manual

Page 246

Advertising
background image

Han HC

Modular

14.

19

Han

®

HC Modular 350

Assembly instructions

Remarks on the axial screw termination see chapter

00

Step 1: The outer diameter of the cable must not ex-

ceed 19.5 mm.

Strip the cable by 19 mm.

Insert the cable through hood.

Step 2: Press the Han NC contact on the cable strand

and apply tightening torque according table 1 by using a

tightening torques tool. Take care that all cable strands

fit completely inside the contact termination cavity. Du-

ring assembling adhere the cable and the contact to

minimise axial movement or twisting.

Step 3: Move the perforated plate D across the HC

contacts.

Step 4: Fit frame E onto the hexagon shape of the HC

contact. Coding can be arranged by turning the contact

within 60° steps. Bolt the frame E together with perfo-

rated plate D.

Step 5: Push back the packet inside the good.

Step 6: Tighten the four M3 (tightening torque 0.5 Nm)

screws and the cable gland according manufacturer re-

commendation.

During the assembly of the frame for 4 poles the fol-

lowing tightening torques have to be taken into consi-

deration:

A = 0.5 Nm

B = 1.5 Nm

C = 0.25 Nm

Advertising