Rockwell Automation 1775-KA PLC-3 Communication Adapter Module User Manual User Manual

Page 43

Advertising
background image

Installation

Chapter 2

2Ć31

Using Manual Switchover

After you select the BACKUP OPERATION for a rev. D. (or later)
1775–KA module, you may choose to use your PLC–3 backup system for
manual switchover. In manual switchover, you must initiate the
switchover by changing the position of a switch in a backup cable. (Refer
to the PLC–3 Programmable Controller Backup Concepts Manual, pub.
1775–803, for more details.) You must be sure to turn off the faulted
PLC–3 processor before you begin the switchover, however.

If a manual switchover occurs:

And:

Then:

the PLC-3 processor is waiting for a

response

the response is ignored

another station on the Data Highway is

initiating a message

you may not receive a response from

either PLC-3 processor. You must

program other stations on the Data

Highway to recover from this condition

you are only communicating with the

primary PLC-3

the other stations on the Data Highway

will receive time-out errors for

messages they send after the primary

goes deactive and before switchover

occurs.

You can program the MSG instruction to execute a message upon
switchover or you can send commands to the backup PLC–3 processor
(Figure 2.13). As long as you get responses from the backup processor,
switchover has not yet occurred.

Advertising