Rockwell Automation 1757-FFLD Linking Device Configuration Manual User Manual

Page 64

Advertising
background image

Publication 1757-PM002A-EN-E - June 2006

4-10 Applications

1. Click the On Line button

.

The Initialize Communication animation begins.

During this time, all Bridges and Fieldbus are identified.

A red x appears next to the H1, FFLD and Device icons. This indicates
that they need to be associated with the actual hardware.

There is an order of precedence in associating devices. The bridges on
the HSE network need to be associated prior to the devices on the H1
network, since the linking device is the link between the H1 and the PC.

Advertising