Rockwell Automation 1757-FFLD Linking Device Configuration Manual User Manual

Page 79

Advertising
background image

Publication 1757-PM002A-EN-E - June 2006

Applications 4-25

Create and Schedule a Routine

1. Right-click Loop and select New Routine.

The New Routine window opens.

2. Enter >Pressure Loop< for the Name.

3. Select Function Block Diagram for the Type.

4. Click OK.

Pressure Loop is added to the Program.

5. Right-click Loop and select Properties.

6. On the Configuration tab, select Pressure Loop for the Main Routine.

7. Click Apply, then click OK.

Pressure Loop is designated the Main Routine.

Advertising