Rockwell Automation 1757-FFLD Linking Device Configuration Manual User Manual

Page 75

Advertising
background image

Publication 1757-PM002A-EN-E - June 2006

Applications 4-21

2. Enter a value of 2000 for the Macrocyle and click OK.

3. Repeat this process for the H1-1 fieldbus.

4. In the HSE Fieldbus window, right-click the HSE icon and select

Download.

5. Click Yes to start loading the configuration.

The Download window shows the download progress.

6. In the H1-1 Fieldbus window, right-click the H1-1 icon and select

Download.

7. Click Yes to start loading the configuration.

The Download window shows the download progress.

8. To download the nodes with schedule errors, repeat steps 1–4

substituting Download Schedule for Download.

Advertising