Create a fieldbus control strategy – Rockwell Automation 1757-FFLD Linking Device Configuration Manual User Manual

Page 71

Advertising
background image

Publication 1757-PM002A-EN-E - June 2006

Applications 4-17

When you have added all the of Blocks and their Parameters, your H1-1
Fieldbus network should look similar to the one below.

Create a Fieldbus Control Strategy

1. In the Project window, right-click the Area 1 icon and select New

Process Cell.

2. Enter >PID Loop< for the Tag and click OK.

The Process Cell is added to the Project.

Advertising