Rockwell Automation 2300 Family of Drive Systems Hardware User Manual

Page 18

Advertising
background image

1-6

Preparing the Inside of an MCC: Roll-Out Chassis Units

1.

2. Remove the horizontal bus access cover, if not already removed, to

expose the bus ends for splicing. Each horizontal bus access cover is
secured with two screws. Reference Figure 1.4.

Figure 1.4 Removing the Horizontal Bus Access Cover in an MCC that Contains a
Roll-Out Chassis Unit

3. Pull all bottom-entry cables, if present, through the conduit(s) to a spot

where you can reach them after you have put the MCCs in place.

If the MCC contains a:

Then:

A 2362 (D-G frame) or 2364F
(K-N code) roll out chassis unit.

Follow the procedures in Chapter 3 to remove
the roll-out chassis from the MCC.

No

tc

h

Hole s

No tch

No

tc

h

Holes

N otch

Horizontal Bus
Access Cover

Advertising