Rockwell Automation 2300 Family of Drive Systems Hardware User Manual
Page 18
Advertising
1-6
Preparing the Inside of an MCC: Roll-Out Chassis Units
1.
2. Remove the horizontal bus access cover, if not already removed, to
expose the bus ends for splicing. Each horizontal bus access cover is
secured with two screws. Reference Figure 1.4.
Figure 1.4 Removing the Horizontal Bus Access Cover in an MCC that Contains a
Roll-Out Chassis Unit
3. Pull all bottom-entry cables, if present, through the conduit(s) to a spot
where you can reach them after you have put the MCCs in place.
If the MCC contains a:
Then:
A 2362 (D-G frame) or 2364F
(K-N code) roll out chassis unit.
Follow the procedures in Chapter 3 to remove
the roll-out chassis from the MCC.
No
tc
h
Hole s
No tch
No
tc
h
Holes
N otch
Horizontal Bus
Access Cover
Advertising