Installing the zero potential (te) bus splice, Installing the zero potential (te) bus splice -16 – Rockwell Automation 2300 Family of Drive Systems Hardware User Manual

Page 56

Advertising
background image

5-16

Installing the Zero Potential
(TE) Bus Splice

Note: If the MCCs to be joined do not have a TE bus, discard the
hardware for splicing together the TE bus and disregard this procedure.

1. Verify that the following splice hardware is present:

2. Slip one flat washer onto one hex-head screw. See Figure 5.10.

3. Repeat 2 once.

4. Position the busbar splice in front of the discontinuity in the TE bus.

5. Align the two elongated holes of the busbar splice over the two holes

bordering the discontinuity in the TE bus.

6. Slide the same two hex-head screws through both the busbar splice and

the TE bus, from the front.

7. To each hex-head screw, slide on one flat washer, one lock washer, and

one nut.

8. Torque both hex-head screws to 108 lb-in (12.2 N-m).

Figure 5.10 Installing the TE Bus Splice

Description

Quantity

1/4” x 1” busbar splice

1

1/4” x 1” hex-head screw

2

Flat washer

4

Lockwasher

2

1/4” nut

2

2

6 *

5

Nut

Lock washer

Flat Washer

TE/PE Bus Splice

Flat Washer

Hex-Head Screw

Advertising