Installation procedure, Installation procedure -5 – Rockwell Automation 2300 Family of Drive Systems Hardware User Manual

Page 31

Advertising
background image

2-5

Installation Procedure

Follow the procedure below to install a bucket unit into an MCC:

1. Open the door of the MCC.

2. Verify that the bucket and vertical bus are either DC or AC (both the

bucket and vertical bus should have L1, L2, and L3; or L1 and L3 only).
See Figure 2.3.

Figure 2.3 Valid Bucket Connections

3. Push the bucket backward to plug into the vertical bus, holding the upper

right-hand latch assembly and the lower left-hand tab handle (Figure 2.2
shows how the bucket will plug into the vertical power and ground
buses).

!

ATTENTION: To avoid the hazard of electrical shock, verify
that all voltages on the system bus network have been discharged
before attempting to service the system.
ATTENTION: The 2362 A-frame bucket weighs
approximately 45 pounds (21 kg); the B-frame bucket weighs
approximately 90 pounds (41 kg); and the
C-frame bucket weighs approximately 140 pounds
(64 kg). Failure to take precautions when moving a bucket may
result in personal injury and/or damage to equipment.

L1

L2

L3

L1

L3

3-Phase AC Vertical Bus

Yes

Yes

Bucket

No

No

DC Vertical Bus

Bucket

Advertising