Rockwell Automation 2300 Family of Drive Systems Hardware User Manual

Page 53

Advertising
background image

5-13

Installing Straight Control Bus Splices

Use this procedure if bus ends are at the same depth:

1. Verify that the following splice hardware is present:

2. Slide one lock washer and one flat washer onto a screw.

3. Repeat 2 once.

4. Position one busbar splice in front of the discontinuity in the upper

control bus. Reference Figure 5.7.

Figure 5.7 Installing a Straight Control Bus Splice

5. Align the two elongated hoes of the straight control busbar splice over

the two holes bordering the discontinuity in the upper control bus.

6. Fasten the straight control busbar splice to the upper control bus, from

the front, using the same two hex head screws.

7. Torque both hex head screws to 108 lb-in (12.2 N-m).

8. Repeat 2 through 7 to splice together the lower control bus.

Description

Quantity

2-hole, straight busbar splice

2

1/4-20 x 3/4” hex-head screw

4

Flat washer

4

Lockwasher

4

Flat Washer

Hex-Head Screw

Lock washer

Straight Control

Bus Splice

L1

N

120 V AC

Threaded
Insert

Advertising