Chapter 5, Installing busbar splices, Introduction – Rockwell Automation 2300 Family of Drive Systems Hardware User Manual
Page 41: Before you begin, Introduction -1 before you begin -1

Chapter
5
Installing Busbar Splices
Introduction
This chapter provides the necessary steps to install power, control,
equipment grounding conductor (PE), and zero potential (TE) bus splices.
Before You Begin
Before you begin your installation:
1. Verify that MCCs have been joined together as specified by instructions
provided in Chapter 1.
2. Be sure you have the following:
• One PE / TE (equipment grounding conductor / zero potential) bus splice
kit for every two sections just joined.
• One control bus splice kit, if both sections have a control bus, for every
two sections just joined.
• One power bus splice kit for every two sections just joined.
• Tool(s) you will need to:
– tighten screws:
1/4” thread-forming screw (0.375” across flats)
– torque bolts:
1/4” bolt (0.438” across flats)
– secure screws and nuts:
1/4” nut (0.438” across flats)
3/8” nut (0.563” across flats)