Rockwell Automation 57C329 Remote I/O Communications, AutoMax User Manual

Page 47

Advertising
background image

3Ć21

REMOTE HEAD

OR

RAIL

GROUNDING STUD

GROUNDING STUD

Figure 3.19 Ć Grounding Stud Location

Step 4.

Connect a green wire from earth ground to either stud on

the Remote I/O Head housing. For proper termination, a

lug should be used. A star washer (toothed lock washer)

should be used under the lug to ensure effective

grounding to the Remote I/O Head.
If the Remote I/O Head is to be mounted on a properly

grounded subĆpanel, remove all paint, coating, and

corrosion where the Remote I/O Head is to be mounted.

(Paint on the mounting surface will prevent good electrical

contact.) Use a star washer between the subĆpanel and

the Remote I/O Head for a good electrical connection.
As I/O Rails are installed, grounding should be run from

each rail to this common ground (see figure 3.20).

Advertising