Make cable connections, Chapter, Prepare cables – Rockwell Automation DeviceNet Media Design Installation Guide User Manual

Page 61

Advertising
background image

1

Publication DNET-UM072C-EN-P - July 2004

Chapter

3

Make Cable Connections

Prepare Cables

In Chapter 1, you determined the required lengths of trunk line and drop line
segments for your network. To cut these segments from reels of thick, thin and
flat cable, use a sharp cable cutter and provide sufficient length in each
segment to reduce tension at the connector.

TIP

Select an end of the cable segment that has been cleanly
cut. The positions of the color-coded conductors should
match the positions at the face of the connector.

IMPORTANT

Before beginning, make sure:

the DeviceNet cable system is inactive

all attached devices are turned off

any attached power supply is turned off

you follow the manufacturer’s instructions for
stripping, crimping, and/or tightening

TIP

Adhere to the cable routing and spacing guidelines
described in Industrial Automation Wiring and Grounding
Guidelines, publication 1770-4.1.

TIP

The catalog numbers listed in this document are
representative of the full range of available DeviceNet
media products. For a complete list of DeviceNet media,
refer to the On-machine Connectivity Catalog,
publication M115-CA001.

Advertising