Rockwell Automation 1794-Lxxxx PhaseManager User Manual

Page 100

Advertising
background image

100

Publication LOGIX-UM001B-EN-P - April 2010

Appendix A

Equipment Phase Instructions (PSC, PCMD, POVR, PFL, PCLF, PXRQ, PRNP, PPD, PATT, PDET)

Example: Relay Ladder

If Step.1 = 1 (first step in the sequence) then

Each PATT instruction tries to take ownership of an equipment phase.
If the Result of a PATT instruction = 0 or 24582 (the program owns the equipment phase), then

A bit within the Ownership tag = 1. (In the Ownership tag, each equipment phase is assigned a bit.)

If Ownership = 3 (The program owns both equipment phases as shown by bits 0 and 1.), then:

Done = 1. (This signals the sequence to go to the next step.)