Phase state complete (psc) – Rockwell Automation 1794-Lxxxx PhaseManager User Manual
Page 59
Advertising
![background image](/manuals/581567/59/background.png)
Publication LOGIX-UM001B-EN-P - April 2010
59
Equipment Phase Instructions (PSC, PCMD, POVR, PFL, PCLF, PXRQ, PRNP, PPD, PATT, PDET)
Appendix A
Phase State Complete
(PSC)
Use the PSC instruction to signal an equipment phase that the state routine is
complete so go to the next state.
Operands:
Relay Ladder
none
Structured Text
none
You must enter the parentheses ( ) after the instruction mnemonic, even
though there are no operands.
Description:
The PSC instruction signals the completion of a phase state routine.
In the running state routine, use the PSC instruction to
transition the equipment phase to the complete state.
Advertising
This manual is related to the following products: