Rockwell Automation 1794-Lxxxx PhaseManager User Manual

Page 101

Advertising
background image

Publication LOGIX-UM001B-EN-P - April 2010

101

Equipment Phase Instructions (PSC, PCMD, POVR, PFL, PCLF, PXRQ, PRNP, PPD, PATT, PDET)

Appendix A

Structured Text

At the first step in the sequence, this action tries to take ownership
of 2 equipment phases that the sequence uses.

This action checks that the program owns the equipment phases. If
the Result of each PATT instruction = 0 or 24582 (the program owns
the equipment phase), then

A bit within the Ownership tag = 1. (In the Ownership tag, each
equipment phase is assigned a bit.)

If Ownership = 3 (The program owns both equipment phases as shown by bits 0 and 1.), then the
SFC goes to the next step.

Advertising
This manual is related to the following products: