Rockwell Automation 1794-Lxxxx PhaseManager User Manual

Page 103

Advertising
background image

Publication LOGIX-UM001B-EN-P - April 2010

103

Equipment Phase Instructions (PSC, PCMD, POVR, PFL, PCLF, PXRQ, PRNP, PPD, PATT, PDET)

Appendix A

Example:

Relay Ladder

Structured Text

If Step.6 = 1 (step 6 in the sequence) then

Each PDET instruction relinquishes ownership of the equipment phases that the sequence owned.
Each Ownership bit = 0. (In the Ownership tag, each equipment phase is assigned a bit.)
Done = 1. (This signals the sequence to go to the next step.)

When the sequence is done, this action:

• relinquishes ownership of the equipment phases
• clears the ownership flags (bits that the SFC set when it took

ownership of the equipment phases)

The P1 qualifier limits this to the first scan of the step.

Advertising
This manual is related to the following products: