Rockwell Automation 1794-Lxxxx PhaseManager User Manual
Page 103
Advertising

Publication LOGIX-UM001B-EN-P - April 2010
103
Equipment Phase Instructions (PSC, PCMD, POVR, PFL, PCLF, PXRQ, PRNP, PPD, PATT, PDET)
Appendix A
Example:
Relay Ladder
Structured Text
If Step.6 = 1 (step 6 in the sequence) then
Each PDET instruction relinquishes ownership of the equipment phases that the sequence owned.
Each Ownership bit = 0. (In the Ownership tag, each equipment phase is assigned a bit.)
Done = 1. (This signals the sequence to go to the next step.)
When the sequence is done, this action:
• relinquishes ownership of the equipment phases
• clears the ownership flags (bits that the SFC set when it took
ownership of the equipment phases)
The P1 qualifier limits this to the first scan of the step.
Advertising
This manual is related to the following products: