Phasemanager quick start, Purpose of this chapter, Equipment – Rockwell Automation 1794-Lxxxx PhaseManager User Manual

Page 17: Chapter 2, Purpose of this chapter equipment, Chapter

Advertising
background image

17

Publication LOGIX-UM001B-EN-P - April 2010

17

Chapter

2

PhaseManager Quick Start

Purpose of This Chapter

Use this quick start to:

• get an introduction to how an equipment phase runs.
• monitor an equipment phase.
• manually tell an equipment phase to go to a different state.

Use this quick start when you want to:

• try out PhaseManager software for the first time.
• test an equipment phase by manually stepping through its states.

Equipment

To use this quick start, you need:

• a Logix5000 controller. See the preface if you aren’t sure which

controllers are Logix5000 controllers.

• firmware, revision 18.0 or later, for the controller
• a power supply for the controller
• a communication path to the controller:

Communication card or built-in port
Corresponding communication cable

• RSLogix 5000 programming software, version 18.0 or later

Topic

Page

Create an Equipment Phase

18

Create a State Routine

18

Manually Step Through the States

19

Configure the Initial State for an Equipment Phase

22

Advertising
This manual is related to the following products: