2 - create a panelview plus application, Before you begin, Chapter 2 – Rockwell Automation Logix5000 Control Systems: Connect PanelView Plus Terminals over EtherNet/IP Quick Start User Manual

Page 21: Create a panelview plus application, You m, Create a panelview, Plus application

Advertising
background image

Rockwell Automation Publication IASIMP-QS033A-EN-P - March 2012

21

Chapter

2

Create a PanelView Plus Application

In this chapter, you learn how to complete the following tasks:

Create a push button and a multi-state indicator in FactoryTalk View Studio software.

Transfer the application to the 2711P-K10C4D1 drive so you can test communication with
the controller.

Before You Begin

You must complete these tasks before using this chapter:

The tasks described in

Before Using This Publication on page 5

, including:

Prepare the Logix5000 control system hardware

Prepare the computer

Configure the networks

- The tasks described in this chapter require an

EtherNet/IP network.

Create an RSLogix 5000 project

- In your RSLogix 5000 project, include a ladder logic

rung with Examine On and Output Energize elements as shown. In this example, the
alias tag named OB16_Light is an alias for point Local:1:O.Data.0.

The example RSLogix 5000 project used in this chapter uses a
CompactLogix 5370 L3 controller.

Advertising