Test the indicator and push button, Test the indicator, And push button – Rockwell Automation Logix5000 Control Systems: Connect PanelView Plus Terminals over EtherNet/IP Quick Start User Manual

Page 40

Advertising
background image

40

Rockwell Automation Publication IASIMP-QS033A-EN-P - March 2012

Chapter 2 Create a PanelView Plus Application

The Indicator tag is populated.

12.

Click OK.

13.

From the File menu,
choose Save.

14.

When prompted for a display
title, type
PanelView_Plus_project.

Test the Indicator and Push Button

1.

Verify that the mode switch on your controller is moved to Run.

2.

Right-click an unused area of
the display and select Display
Settings.

3.

Change the Maximum Tag
Update Rate to 0.05.

4.

Click OK.

Advertising