Chapter 2 Create a PanelView Plus Application
The Indicator tag is populated.
12.
Click OK.
13.
From the File menu,
choose Save.
14.
When prompted for a display
title, type
PanelView_Plus_project.
Test the Indicator and Push Button
1.
Verify that the mode switch on your controller is moved to Run.
2.
Right-click an unused area of
the display and select Display
Settings.
3.
Change the Maximum Tag
Update Rate to 0.05.
4.
Click OK.