09 connect coolant leads, Connect coolant leads -9, Ultra-cut 100 xt – Tweco 100 Ultra-Cut Plasma Cutting System with Automated Gas Control User Manual
Page 33
Advertising
ULTRA-CUT 100 XT
Manual 0-5303
INSTALLATION
3-9
3.09 Connect Coolant Leads
1. Connect the color-coded coolant hoses to the coolant connections on the power supply rear panel. The
supply line (out) is flagged green, the return line (in) is flagged red.
COOLANT
RETURN SUPPLY
Coolant Connections
RED
GREEN
To RAS 1000 Arc Starter or
HE-400 Heat Exchanger if used
Art # A-11534_AB
USER INPUT
HEIGHT CONTROL
F1 - 8A SB 230 VAC
F2 - 8A SB 230 VAC
CB4 - 5A 120 VAC
CB3 - 5A 24 VAC
CB2 - 5A 120 VAC
J55 - GCM
J15 - CNC
J59 - RAS
J70 - HE
J54 - TSC /COMM
Advertising