Clear Weight Transfer Cylinders
Refer to Figure 11
38. At the bulkhead
at the left rear of the cart, unplug
all hydraulic hoses and cables. Some cable con-
nects may not be at the bulkhead.
39. At the cart-implement pull link, remove and save
two sets of base end pins of the weight transfer
(upper) cylinders
:
2A0132 MW PIN CLIP
2A0206 MW PIN SHORT
40. Release the cylinder hoses from any clamps on the
pull link.
41. At the rod ends of the weight transfer cylinders,
remove and save two sets:
2A0132 MW PIN CLIP
805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT
42. Lift the cylinders
810-219C CYL 3.5X16X2 ROD (TIE ROD)
off the pull link and rest them on the implement
frame. It may not be necessary to disconnect their
hoses.
Clear Link Lift Cylinders
Refer to Figure 12
43. Release the cylinder hoses from any clamps on the
pull link.
44. Remove and save the clevis pins at each end of the
(lower) pull link lift cylinders
:
2A0132 MW PIN CLIP
805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT
45. Lift the cylinders
810-170C CYL REP 3.5X10X1.25 ROD (TIE)
off the pull link and rest them on the implement
frame. It may not be necessary to disconnect their
hoses.
46. At the lift lugs
, remove and save two sets:
805-104C PIN COTTER 3/16 X 1 1/2 PLT
805-187C PIN CLEVIS 1 X 2 1/4 GR5 PLT
then remove and save the lugs:
160-754D NTA607 PULL LINK CYLINDER LUG
Figure 11
Clear Weight Transfer Cylinders
Q0047
1
197
141
140
206
1