Clear weight transfer cylinders, Clear link lift cylinders – Great Plains 2007HD Update Installation User Manual

Page 14

Advertising
background image

10

NTA607HD or NTA2007HD

Table of Contents

Index

Great Plains Manufacturing, Inc.

166-370M

Table of Contents

Index

05/25/2011

Clear Weight Transfer Cylinders

Refer to Figure 11
38. At the bulkhead

at the left rear of the cart, unplug

all hydraulic hoses and cables. Some cable con-
nects may not be at the bulkhead.

39. At the cart-implement pull link, remove and save

two sets of base end pins of the weight transfer
(upper) cylinders

:

2A0132 MW PIN CLIP

2A0206 MW PIN SHORT

40. Release the cylinder hoses from any clamps on the

pull link.

41. At the rod ends of the weight transfer cylinders,

remove and save two sets:

2A0132 MW PIN CLIP

805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT

42. Lift the cylinders

810-219C CYL 3.5X16X2 ROD (TIE ROD)

off the pull link and rest them on the implement
frame. It may not be necessary to disconnect their
hoses.

Clear Link Lift Cylinders

Refer to Figure 12
43. Release the cylinder hoses from any clamps on the

pull link.

44. Remove and save the clevis pins at each end of the

(lower) pull link lift cylinders

:

2A0132 MW PIN CLIP

805-124C PIN CLEVIS 1 X 3 11/16 GR5 PLT

45. Lift the cylinders

810-170C CYL REP 3.5X10X1.25 ROD (TIE)

off the pull link and rest them on the implement
frame. It may not be necessary to disconnect their
hoses.

46. At the lift lugs

, remove and save two sets:

805-104C PIN COTTER 3/16 X 1 1/2 PLT

805-187C PIN CLEVIS 1 X 2 1/4 GR5 PLT

then remove and save the lugs:

160-754D NTA607 PULL LINK CYLINDER LUG

Figure 11

Clear Weight Transfer Cylinders

Q0047

1

197

141

140

206

1

206

141

140

141

197

Figure 12

Clear Link Lift Cylinders

Q0129

205

115

199

195

141

197

206

205

141

197

205

115

195

199

115

Advertising
This manual is related to the following products: