Install new bar – Great Plains 2007HD Update Installation User Manual

Page 70

Advertising
background image

66

NTA607HD or NTA2007HD

Table of Contents

Index

Great Plains Manufacturing, Inc.

166-370M

Table of Contents

Index

05/25/2011

Install New Bar

Refer to Figure 105
376. Select one new coulter bar:

807-300C COULT SPR BAR 3/4 X 2 1/2 X 18

Insert the new bar in the clamps

, set to the

same height relative to the tool bar.

377. Tighten U-bolt nuts

to snug. Ensure that U-bolts

are perpendicular to tool bar.

378. Tighten clamp cross-bolt nuts

to torque spec.

Ensure that clamp faces touch.

379. Tighten U-bolt nuts

to torque spec.

380. Mount the coulter assembly

on the bottom of

the new bar, using the saved mount

, bolts

,

lock washers

and nuts

. Check coulter to

opener and row alignment before final tightening.

381. Repeat step 372 through step 380 for each row.

Figure 105

Coulter Mounting

29353

969

180

192

170

137

136

969

178

103

177

167

969

103

178

177

178

137

136

170

192

180

Advertising
This manual is related to the following products: