Connect wsmb #5 – Great Plains 2007HD Update Installation User Manual
Page 53
Great Plains Manufacturing, Inc.
Update Harness
49
05/25/2011
166-370M
Refer to Figure 77 (on page 45) and Figure 81 (which is part
of the full harness diagram found on page 88 and 89)
288. If WSMB
(on Tower C) does not have a WSMB
harness connected, select one saved:
467981201A INT AG HARNESS, WSMB MODULE
Connect the 12-pin receptacle leads
WSMB
.
289. Connect the 4/6-pin CANbus plug leads
4/6-pin CANbus receptacle leads
WSMB harness
from WSMB
.
290. Select a saved:
291. Connect the WSMB’s 12-pin plug leads
12-pin receptacle leads of the row harness
292. Use cable ties to secure the row harness core to
Tower G.
293. Select eight new 91 cm (3ft) extensions:
459680920 EXT. HARNESS 3’, FAN RPM
Connect these to harness sensor leads
9 through 16.
294. Connect the 3-pin sensor leads
or extensions to
their respective fertilizer row blockage sensors, per
the chart on page 87 and the diagram on page 89.
The rows requiring extensions are off the illustration
at right - see page 89.
295. Select one saved:
Connect the plug end
of this harness to the
receptacle end
harness
Route the cable toward Tower B. Route the cable at
the right wing pivot so that it passes through pivot
centerline, and has just enough slack for wing fold-
ing.
Figure 81: Tower C/G
Q0118
WSMB
5
G
931
C
c
b
d
931
a
#5