3 server installations and upgrades, 1 before you begin, 1 tools and supplies needed – Kontron TIGW1U Carrier Grade Server User Manual

Page 23: 2 system references, 3 cable routing reference, Server installations and upgrades, Before you begin23 3.1.1, Tools and supplies needed, System references, Cable routing reference

Advertising
background image

Kontron Carrier Grade Server TIGW1U

December 2009

Product Guide, rev. 1.3

23

Server Installations and Upgrades—TIGW1U server

3

Server Installations and Upgrades

3.1

Before You Begin

Before working with your server product, pay close attention to the safety instructions

provided in this manual. See

Appendix A, “Safety Information”

.

Warning:

Electrostatic discharge (ESD) and ESD protection: ESD can damage disk drives,

boards, and other parts. We recommend that you perform all procedures in this chapter

only at an ESD workstation. If an ESD workstation is not available, provide some ESD

protection by wearing an antistatic wrist strap attached to chassis ground (any

unpainted metal surface) on your server when handling parts.

3.1.1

Tools and Supplies Needed

• Phillips* (cross-point) screwdriver (#1 bit and #2 bit)
• Anti-static wrist strap and conductive foam pad

3.1.2

System References

All references to left, right, front, top, and bottom assume that you are facing the front

of the server, as it would be positioned for normal operation.

3.1.3

Cable Routing Reference

It is important for cables to be connected correctly. See

Figure 9

. For more detailed

information about cable connectors, see the Kontron Carrier Grade Server TIGW1U

Technical Product Specification.

Advertising