1 installing the intel® raid smart battery, Installing the intel – Kontron TIGW1U Carrier Grade Server User Manual

Page 48

Advertising
background image

TIGW1U server—Server Installations and Upgrades

Kontron Carrier Grade Server TIGW1U

Product Guide, rev. 1.3

December 2009

48

3.4.7.1

Installing the Intel

®

RAID Smart Battery

The Intel

®

RAID Smart Battery is located just behind the front panel near HDD drive

bay 0. The connector is on the far right end of the SAS Front Panel (SFP) board.

The Smart Battery has an internal battery power cable that must be connected.

1. Open the Smart Battery case lid. If necessary, use a small flat blade screwdriver to

pry open the lid at the corners. (“A” in

Figure 33

)

2. If the battery power cable is not connected, connect it now. (“B”)

3. Lift the battery assembly out of the case and insert the battery cable through the

opening in the bottom of the case. (“B” in

Figure 34

)

4. Attach the battery cable to the connector on the back of the battery assembly. (“A”)
5. Put the battery assembly back into the case and close and latch the case lid. (“C”)

Figure 33.

Connecting the Smart Battery Power Cable

TS000292

A

B

Figure 34.

Connecting the Smart Battery Cable Through the Battery Case

TS000293

C

B

A

Advertising