4 installing the intel® remote management module 2, 1 installing the gcm module, 2 installing the rmm2 – Kontron TIGW1U Carrier Grade Server User Manual

Page 59: Installing the intel, Installing the gcm module, Installing the rmm2

Advertising
background image

Kontron Carrier Grade Server TIGW1U

December 2009

Product Guide, rev. 1.3

59

Server Installations and Upgrades—TIGW1U server

3.5.4

Installing the Intel

®

Remote Management Module 2

To install the GCM module and the Intel

®

Remote Management Module 2

(Intel

®

RMM2), you must first remove the chassis top cover, the processor air duct, and

PCI riser card assembly. For instructions, see

Section 3.2.1, “Removing the Chassis

Cover” on page 24

,

Section 3.2.5, “Removing the Processor Air Duct” on page 26

, and

Section 3.4.5.1, “Removing the PCI Riser Card Assembly” on page 42

.

3.5.4.1

Installing the GCM Module

1. Remove the filler panel from the rear panel of the chassis by squeezing the side

edges and pushing it out from inside the chassis. (

Figure 48

, “A”)

2. Snap the two standoffs into the S5000PHB server board server board. (

Figure 49

,

“C”)

3. Attach the GCM module to the server board using the connector. (“D”)

3.5.4.2

Installing the RMM2

1. Insert the standoff into the hole labeled “TH4” on the Intel

®

RMM2. (

Figure 49

, “A”)

The standoff fastens to the bottom side of the module.

2. Fasten the RMM2 to the S5000PHB server board server board site using the

Advanced Server Management Interface (ASMI) connector (“B”) and snap the

standoff into the matching hole in the server board.

3. If this is the last task you are performing, replace the riser card assembly, the

processor air duct, and the top cover of the chassis. Reconnect all the external

devices and plug in the power cord(s).

Figure 48.

Removing the GCM Port Filler Panel

A

TS000413

Advertising