Chapter 3 testing/troubleshooting – Interlogix Concord Express Installation Manual User Manual

Page 77

Advertising
background image

Concord Express Installation Instructions

71

Chapter 3

Testing/Troubleshooting

This section describes the following subjects:

• Basic System Commands
• Testing Zones/Sensors
• Testing Phone Communication
• Testing Central Station/Pager Communication

You should test the system after installing or servicing and after adding or
removing devices from the system. UL Listed systems should be tested weekly.

Refer to the “Troubleshooting” on page 76 if correct test results are not achieved.

Content

Basic system commands 72
Testing Zones/Sensors 72
Testing Phone Communication 73
Testing Central Station/Pager Communication 74
Testing Outputs/Sirens 74
Changing Fixed Display LCD Touchpad Chime and Trouble Beep Tones 76

Troubleshooting 76

Advertising