Implement - smartcable or sdm – TeeJet Matrix Pro 840G User Manual User Manual
Page 45

38
www.teejet.com
HOME
OVER
VIE
W
SE
TUP
POWER
APPENDIX
FULL SCREEN
INTR
ODUC
TION
GUID
ANCE
implement - SmartCable or Sdm
Implement Setup is used to establish number of boom sections, guidance width, spray width, overlap percentage, implement delay on time
and implement delay off time.
Note: If a SmartCable or Section Driver Module (SDM) is not present the configurations for Number of Boom Sections, Overlap, Delay On
and Delay Off will not be available - only Guidance Width and Spray Width can be entered. Please refer to Single Boom Setup to
view setup steps.
1. Press CONFIGURATION side tab .
2. Press
Implement
.
3. Select from:
►Number of Boom Sections
#
– used to select the number of available boom sections
►Guidance Width
– used to enter the width between the guidelines
►Spray Width
– used to enter the width of each implement section
►Overlap
– used to select the amount of overlap allowed when the boom sections are turned on and off
►Delay On
– used to enter the timing for the boom section valves to switch on
►Delay Off
– used to enter the timing for the boom section valves to switch off
4. Press RETURN arrow
or CONFIGURATION side tab to return to the main Configuration screen.
NOTE: Press or to switch between Implement setup screens.
Figure 6-12: Implement Setup Options with SmartCable or SDM
Configuration
Vehicle
implement
AutoSteer
Tilt
lightbar
GPS
Video
Config->implement
Num Sections
Spray width
Guidance width
60.00 ft
144.00 ft
15
Config->implement (2)
Overlap
delay Off
delay On
1.00 s
1.00 s
50%